it should clean the ground construction residues
Posted by Wangkiky Wangkiky over 6 months ago
Strengthen the floor, solid wood multi-storey floor are generally suspended. In addition also pay attention to what kind of situation. Step1: Ground clean-up situation Ground clean-up situation has a great influence on the floor pavement. Before pavement, it should clean the ground construction residues, such as cement residue and grit, which need to be shovel out. For a small amount of uneven ground, you
can use chisel or fill some quick-drying cement. In the floor pavement, but also pay attention to the height of the door reserved. The correct order should be the first door, and then laying the floor. How to determine the height reserved when door is installed, the distance between the lower edge of the door and the floor is at least 5mm, so the height reserved when setting the door is: the height of the keel
(35mm), the height of the floor mat (2mm) The thickness of the floor (9mm), the thickness of the floor (15mm), total: 61mm + 5mm, a total of 66mm. Paving the floor, if the space is not enough, then saw the door in the next along the edge saw the excess. Step2: Mats laying pavement should pay attention to the situation when the mats, mats can not overlap, seams with 60mm wide tape seal around the edge of
[url=http://technofloor.in/composite-floor/5043.html]wood plastic composite floor in malaysia[/url]
[url=http://floorndeck.com/eco-deck/2469.html]diy composite bench for deck[/url]
[url=http://floorndeck.com/wpc-deck/4032.html]pvc wall panel australia sweden[/url]