floors sales promotion
Posted by Liu Yi over 6 months ago
relies on quality 3 minutes, rely on 7 minutes to install a cant that is busy is floor course of study, visible floor installs the importance of link, if ignore installation, floor quality also is no use very again.[url=http://outdoorfloorsupplier.com/affordable-floor/1025.html]light weight 30mm wpc decking for outside decoration[/url] Normally, consumer often takes the quality of floor itself seriously, ignored floor installation however.wood floor is small make up remind, the happening of 5 kinds of circumstances should prevent when laid floor.
1, avoid the area rough whole
Ensure the ground is dry, level off, without sundry, normally floor installation should finish junior travel in other adornment project, the the earth's surface is rough can make partial floor and keel impending,[url=http://outdoorfloorsupplier.com/wholesale-deck/10946.html]How To Cover Over A Patio Inexpensively[/url] noise can be given out when trample.
2, prevent keel without dry
Be in normally without dry wooden keel moisture content 25% the left and right sides, and eligible wooden floor moisture content is in commonly 12% , humidity has differred congress to make wooden floor sucks tide quickly, cause blowout of face of the arch since the floor, lacquer. Apply man-hour to lay good floor first, undertake other construction on the floor next.[url=http://wpcexport.com/wpc/3891.html]using cement blocks for floating decks[/url] But such, after floor laid ends, often need to pass a surname on the time ability burnish with a longer even month. During, the lunt of floor and surroundings, chemical did not make any segregation step, bring about wood probably to the floor changes quickly because of moisture content and be out of shape. Should choose dry, straight lumber does keel and norms is in 2.0cm or 2.5cm are advisable, ensure to steel uses keel and area again after keel level the hammer is fixed.
3, prevent to go all out to had installed a pine or be tightened too
When timber of choose and buy, must reach large quantities of point that send dealer, and cannot be by the side of the street small shop. After because the timber of big jobber is to be in commonly,producing area did dry processing, carry comes to reoccupy container, jobber is direct from container pick up the goods, carry again next the residence that decorates owner, reduced the chance of timber be affected with damp be affected with damp accordingly. If still not be at ease, when buying, might as well the requirement is used hygroscopic undertake to lumber humidity examines, such but no risk at all. What should remind is, 3 days two should be put inside house after lumber is redemptive, after suiting with ground gas phase, [url=http://outdoorfloorsupplier.com/affordable-floor/468.html]plastic composite lumber chairs in color[/url]undertake construction again. The ground still should hold before construction dry, had laid moistureproof layer. Such, timber basically won't reappear metabolic problem.
4, the fixed kind that prevents to use dozen of chock to add Tie Ding
Dozen of chock is used to impose fixed kind of Tie Ding in construction, can build chock of cause of formation and Tie Ding interface is too small and make the power that grasp a hammer insufficient, cause wooden keel extremely easily to become loose, noise can appear when trample floor.
5, prevent occurrence floor length direction and the direction that take the door is abhorrent
Must notice floor length direction should keep consistent with the azimuth that take the door when construction, in order to assure favorable visual result.