floor of the back
Posted by Wangkiky Wangkiky over 6 months ago
According to the special requirements of the Great Hall of the project, Jinqiao floor from production to processing, in addition, because the Great Hall of the floor of the horizontal and vertical precision machining requirements are very strict, [url=http://woodplasticflooring.com/solutions/9225.html]wood decoration materials for Open-air corridor[/url] Jinqiao floor of the equipment has also been carefully adjusted to protect the Product uniformity.
30 minutes after each piece of the floor will be detected, and the floor of the back coated with vegetable oil, to prevent moisture during transport. [url=http://www.outsidewpcdeck.com/projects/9316.html]garden bench replacement slats sydney australia[/url] Each nuance, all reflect the Jinqiao people's high sense of responsibility.
After a number of audit, Jinqiao floor has been the ultimate recognition of the top experts, got the Great Hall of the project; 120 Jinqiao workers,[url=http://homeoutdoordeck.com/blog/10765.html]popular wpc pool decking[/url] with two months time, the successful completion of the Great Hall of the banquet hall floor pavement works. It can be said that every piece of the floor, have their sweat and hard work.