Plate and painting furniture production cycle
Posted by Liu Yi over 6 months ago
Now, has not been out of the program, it is estimated that before the Spring Festival is difficult to delivery, installation. According to report, the current double-sided paste melamine, one-sided paste fireproof cabinet material delivery time is relatively short, but usually 20 days to a month, and paint cabinets delivery cycle is usually more than a month, and some Foreign brands and even play a two-month surplus.
If we must rush, it is likely not completely dry film will directly affect the quality and aesthetics. Art glass Art glass quality and cheap, color and diverse, with no color, no bubbles, stains and many other advantages, as a large number of families to use as a partition. Its production efficiency is high, so it is also fast delivery.
Need to carve the glass, consuming a relatively long, but 3-7 days can also be delivered. Note that many businesses are not responsible for the installation, so the measurement must be accurate, and ultimately by the carpenter to help complete. Furniture Speaking of furniture, unless your home has been basically completed, or you still think about it after New Year. Because, plate and painting furniture production cycle in more than 10 days, delivery is the shortest provision is about 15 days.
Related links:
[url=http://cheapoutdoorflooring.com/boat-deck/157.html]Marina Wood Plastic Floor[/url]
[url=http://cheapoutdoorflooring.com/wall-panel/3996.html]Farm and Ranch Fencing[/url]
[url=http://wpcproduct.com/blog/fireproof-waterproof-outdoor-wall-panel.html]Fireproof & Waterproof Outdoor Wall Panel[/url]