Connect with
KP Alumni now!

recent registrants


Forums - Sports - How to maintain the teak flooring

How to maintain the teak flooring

Posted by Liu Yi over 6 months ago

Wood flooring should be laid in the late construction, not cross construction. After laying should be polished and painted as soon as possible. So as not to stain the wood floor or make the damp deformation. Wood flooring should be unpacked before laying on the laying of the site 1 to 2 days,[url=http://amstraders.in/solid-floor/19905.html]outdoor basketball court[/url] to adapt to the environment, so as not to appear after the expansion and contraction deformation. Laying should be done moisture-proof measures, especially the bottom of the more humid occasions. Moisture measures are covered with moisture-proof paint, shop moisture film,[url=http://amstraders.in/outdoor-fence/29011.html]wood plastic composite decking in dubai[/url] the use of bedding Po and so on. Keel should be flat and firm, avoid using cement reinforcement, preferably with expansion bolts, the United States and other fixed nails. Keel should be used to nail the strong force of larch, Liu and other wood. The moisture content of the keel or wool floor should be close to the moisture content of the wood floor. Keel spacing should not be too large,[url=http://amstraders.in/solid-floor/18104.html]composite decking for sale in indonesia[/url] generally not more than 30 cm. Both ends of the floor should be implemented on the keel, not empty, and each keel must be nailed nails. Do not use water-based glue.