Connect with
KP Alumni now!

recent registrants


Forums - Reunions - Venues - best composite floor supplier

best composite floor supplier

Posted by Wangkiky Wangkiky over 6 months ago

1.Substrate fixed-thickness sanding A large-sized fixed-thickness sanding machine to the surface of the substrate substrate, the end of the fixed-thickness sanding, to ensure that the board flatness and finish, thereby improving product accuracy for the decorative surface Layer of valuable species veneer pressure affixed to provide a reliable guarantee. 2.substrate sorting Health flooring substrate in the initial processing is complete, but also carefully selected by hand, remove the unqualified products. After high temperature and pressure, there is a large internal stress in the substrate, the need for static balance of 15 days to 20 days to release this internal stress, making the substrate balance and stability. This process is called health. 3.Selection of solid wood dough Multilayer parquet for the northern dry environment, so the size of the stability of the key. In order to prevent cracking in the dry heating season, and so on, the big brands of wood flooring surface precious wood veneer all by the professional quality of a piece of staff selection, moisture control is extremely strict. 4.the floor slab billet molding will choose a good veneer monolithic coated with environmentally friendly adhesive attached to the substrate on the floor, and then into the advanced hot-pressing machine for hot pressing, that is made of qualified multi-layer parquet flooring . 5.floor slab health As the floor substrate in the decorative veneer and after hot pressing, slab internal and generated a large internal stress, so that the floor slab needs in the balance of constant temperature and humidity health warehouse Static health 20 days or so, so as to ensure a more stable quality of the floor. 6.the floor cutting slotted through the health, slab cutting equipment will be formed through the slot. Slot quality of the splicing of finished flooring is significant, so the large domestic enterprises to introduce more imports of German cutting equipment to ensure quality. 7.Leaching paint dry finish groove finish the floor, through the leaching paint equipment. After eight primer, four topcoat of the shower coating, the finished surface of the finish will be moist and rich toughness. After just sorting packaging, the end of the entire production process.